建筑施工质量管理中英文对照外文翻译文献
中英文资料翻译
Building construction quality management
Abstract:adhere to the quality first, improve the
management level, improve the quality of construction is the key,
only to meet the required quality standards and user
requirements under the premise of quality, time limit for a project,
cost, to meet the requirements, to provide more high-quality,
safe, economical and applicable building products. Based on this,
the building construction quality management of.
Key words: housing construction building construction
quality management
1 strengthen training, selection of construction personnel is
laying the quality control personnel foundation
Engineering quality were all participants in the project
construction technology management, operating personnel
coordination work results, so construction workers is to form the
main factor of project quality. To control the engineering quality
first is the training and selection of construction personnel,
improving their comprehensive quality. We should improve their
quality awareness, according to comprehensive quality
regardless of idea construction personnel must establish five
concepts: the concept of quality first, pre-control priority idea,
talk with data concept and social benefit and enterprise benefit
and comprehensive benefit idea. The second is the construction
of the technical quality of personnel, management, construction
personnel should have higher quality planning and management
capacity, production personnel should have superb technical
ability, be strict in one's demands of the style of work, strict
implementation of quality standards and procedures of the legal
concept, service personnel should do good technology and
service life, can be with excellent service indirectly to ensure
engineering quality.
2 give full play to QC quality control function
According to "the anti-seizure combination, prevention first
" principle is carried out actively " tell, help, anti, card" scientific
examination method, and the construction
personnel together, common to the owners of construction
process, responsible, quality control personnel, users, the
construction personnel to establish new relations of cooperation,
quality inspection staff and the construction site operations
personnel is consistent, it is to provide users with high quality,
satisfaction of building products. But the construction
production is busy, to snatch the project schedule is loosen
quality management tendency occurs. This led to check the
quality of the project is checked with contradictions between. To
give full play to the initiative of the staff to check the quality of
the project, it is necessary to establish the authority of the quality
inspection personnel, it is very necessary and important.
3 following a case analysis gradually quality management,
engineering survey:
The territory of Hechi a building for the underground layer,
on the ground twenty-two, twenty-five buildings, covers an area
of 2550.4 square meters, building a total height of 79.950 meters,
construction area of 4008 square meters underground, on the
ground 36855 square meters, balcony area is 1570.1 square
meters; the main design reasonable service life is 50 years;
building fire grade two, seismic fortification intensity is 7 degrees,
frame aseismic grade two; the ground floor to the ground floor