Tool List

工具参考

Service and Support

技术支持

Crosshead screwdriver

十字螺丝刀

Flathead screwdriver

一字螺丝刀

Marker pen

记号笔

M6 Plug bolt

M6膨胀螺栓

Percussion drill(φ8 Drill bit)

冲击钻(φ8钻头)

Claw hammerAdjustable spannerESD-preventiveCable tieOptical fiber bundling tapeDiagonal pliers

羊角锤活动扳手防静电手套线扣光纤绑扎带斜口钳

Accessories (S1700-52R-2T2P-AC)

设备附件介绍(S1700-52R-2T2P-AC)

Rubber pads

胶垫贴

Captive nut

浮动螺母

M4 screw

M4

螺钉

M6 screw

M6

螺钉

Short rack-mounting ear

短挂耳

Precautions

注意事项

Before installation, take ESD-preventive measures, for example, wear ESD-preventive gloves or a wrist strap.

安装前请做好防静电保护措施,如配戴防静电手套或防静电手腕。

Installing the Device in a 19'' Cabinet

安装设备到19英寸标准机柜中

Fix the rack-mounting ears.

安装挂耳。

Install the device in a cabinet.

安装设备到机柜。

IEC cabinet (19 inch)

IEC机柜(19英寸)

Fix the captive nuts.

安装浮动螺母。

1U=44.45mm

1U

Use installation strip to fix the captive nuts.

使用安装条安装浮动螺母。

4

Installing the Device on a Worktable

安装设备到工作台

Adhibit the rubber pads.

粘贴胶垫贴。

Install the device on a worktable.

安装设备到工作台。

Rubber pads

胶垫贴

Installing the Device on a Wall

安装设备到墙面

●To prevent injuries, check that there is no electrical wire at the locations to be drilled before drilling holes in the wall.

●Flammable and explosive items under the device is prohibited. Leave more than 100 mm of space around the device for proper heat dissipation.

在墙上打孔时,必须确认打孔处没有墙电,避免造成人身伤害。

设备下方禁止摆放易燃易爆物品,距离设备100mm范围内不能有异物挡住。

Fix the rack-mounting ears.

安装挂耳。

Install the plug bolt.

安装膨胀螺栓。

φ8 Drill bit

φ8钻头

M6plug bolt

M6膨胀螺栓

90

Install the device on the wall.

安装设备到墙面。

Mark the hole locations on the wall according to

the device installed with rack-mounting ears.

根据已安装挂耳的设备,用记号笔标记打孔位置。

Installing the SFP Transceiver

SFP收发器的安装

Insert the transceiver with the optical connector

facing outward and the slot connector facing down.

插入SFP收发器,光纤连接口朝外,且插槽朝下。

Connect the LC connector to SFP transceiver.

将光纤的LC连接器连接到光模块上。

5

Connecting PGND Cables and Power Cables

连接保护地线和电源线

Connect the PGND cable.

连接地线。

Connect the AC power cable.

连接交流电源线。

● Do not connect power cables when the device is powered on, so as to avoid injuries.

● Do not power on the device before device installation and cabling are completed.

● Make sure that the protection grounding cable of the device is grounded.

● The S1700-52R-2T2P-AC can use only AC power supply.

● 严禁带电安装电源线,以免造成人身伤害。

● 严禁在设备安装和布线完成前向设备供电。

● 确定设备保护地线接地。

● S1700-52R-2T2P-AC只支持交流电源。

Laying out Cables

布放线缆

Optical fibers

光纤

Cable tie

线扣

Fiber bundling tape

光纤绑扎带

6

● Do not stare at optical interfaces. The optical fiber contains laser light sources that hurt human eyes.

● Lay out and bundle power cables, optical fibers, and Ethernet cables separately, with the distances in between longer than 10 cm.

● 不要直视光纤接口,光纤中的激光会伤害眼睛。

● 电源线与信号线缆的间距要大于10厘米。

During the cabling, if the quantity of cables is rather great, you can route the cables in the cabinet first, and then install connectors

to the cables.

布线时,如果线缆数目比较多,为了布线更方便,可以先不做线缆接头,先将线缆在机柜中布置好,再做与设备连接的线缆接头。

Powering on the System

上电检查

● Power on the device only when the input voltage is in the normal range. Test the AC input voltage for S1700-52R-2T2P-AC.

The voltage should range from 100 VAC to 240 VAC.

● After the device is powered on, the PWR LED is on. the port LED status is as shown in below.

● 测试S1700-52R-2T2P-AC的输入电压,若此电压在100-240V交流电正常范围内可将设备上电。

● 设备上电后,PWR电源指示灯亮,端口LED灯状态如下图所示。

1-48 Port LED

1-48 端口指示灯

GE1-GE4 Port LED

GE1-GE4 端口指示灯

PWR LED

电源指示灯

LED Indicator

LED状态

LED

PWR

Condition

状态