分包控制管理Subcontract management

为加强分包队伍管理,确保工程安全、优质、建精品目标,使分包队伍管理上档次,队

伍上层次,特规定办法:for strengthening the management of subcontracting, objective, high

quality and build quality ensure security so that subcontracting management on the grade, on a

team level, special provision

一、分包队伍建设

1.参加施工人员必须身体健康(体检合格),思想素质好,在当地无劣迹。participation in

the construction personnel must be in good health (medical clearances), ideological quality is

good, no bad on the ground

2.分包队伍必须按分公司管理规定,严格管理好自己的队伍,施工人员着工作服施工,

施工队管理人员必须配待各类臂章等。subcontract must be as provided in branch

management, strictly manage your team and construction staff with clothes-construction,

construction management personnel must be of various types of armbands, and so on

3.施工住地宿舍要保持清洁、卫生、内务整齐。construction of residence dormitory to keep

clean, sanitary, House in order

4.要遵纪守法,增强法制观念。discipline and law, enhance the concept

二、工程施工construction

1.分包施工队施工时必须按照作业指导书要求作业,按图纸施工。subcontracted

construction team construction must be in accordance with the working instructions require job,

according to the drawings

2.各种记录严格按照国际认证《ISO—9002质量体系标准》填写清楚,字迹工整、数据

准确。records strictly according to certified ISO-9002 quality system standard write clearly, neat,

data accuracy

3.材料供应实行限额领料制度,各种材料按数量发放。严格按供应科管理制度执行。

implementation of limit picking system of material supply, various materials by quantity issued.

In strict accordance with supply management policies

4.工器具领用,严格按供应科工器具管理制度执行。供应科与分包队共同设立工器具台

帐,工器具实行按施工需要配备,工程结束后工器具按帐目上交供应科。如有丢失损坏按价

赔偿。apparatus using strictly according to the supply section instruments management system

implementation. Subcontracting and supply section sets up joint utensils account, utensils

implemented by construction will require, engineering end of utensils by accounts handed in the

supply section. Such as loss damage compensation

5.质量要求。quality requirements

要达到国家优质级精品。杜绝较大级以上不合格品出现,严格按国际认证《ISO—9002

质量体系标准》及公司制定的质量体系控制程序文件执行。To achieve national high quality

products. Put an end to nonconforming appears above the large level, in strict accordance

with the ISO-9002 quality system standards and international certification company quality

system control program files

根据有关质量管理规定,分包单位应从工程款的总价中抵扣一定比例的质量保证金。

According to the provisions relating to quality management, subcontractors should be removed

from the project fund in the total price of the credit quality of a certain proportion of the margin

开工前分公司要对分包队进行质量技术交底否则不准开工。

Pre-construction branch to quality technology gives the low-down a subcontract shall be

permitted to start

6.安全管理。safety management

根据有关安全管理规定,各分包单位应从工程款中扣押一定比例的安全保证金。In

accordance with the relevant security regulations, all subcontractors should be removed from the

attachment of a proportion of the security deposit in the project

各分包队开工前要组织本单位全体职工开展一次全面系统的安全教育,结合工程的特点

对全员进行安全考试。Before the subcontract teams started to organize the units of all the

workers carrying out a comprehensive system of safety education, combined with engineering

features to secure the full examination

分包队要严格执行国家电力公司及国家安全部门颁布的所有安全规定,对无视安全的单

位及个人分公司有权责令停止施工作业及罚款,具体管理办法按分公司安监下发的《安全管

理规定及处罚条例》执行。Subcontracting team will strictly enforce the State power companies

and the State Security Department issued all safety requirements, to disregard security unit and

individual branches of the right to order them to stop construction work and a fine, the specific

measures for the administration of safety supervision in the security management regulations

issued by branch and penal enforcement

开工前分公司要对分包队进行一次安全技术交底,否则不准开工。Pre-construction

branch to secure technology gives the low-down the subcontracting team once, shall be